Article Read Time:

2 Min

Search

Subcribe :

Train Your Team:

Our Extensions:

Join For FREE:

How to Manage Landed Costs in Zoho Inventory: Step-by-Step Guide

Step-by-step guide to enable, allocate, and report landed costs in Zoho Inventory for accurate cost accounting and valuation.

Quick Overview

  • Enable landed cost tracking in item settings
  • Create a purchase order and convert it to a bill
  • Add service items for landed costs like freight or labor
  • Allocate costs by quantity, value, weight, or dimensions
  • Track actual inventory value through reports

Video Walkthrough

What Are Landed Costs?

Landed costs are additional expenses — such as freight, import duties, or labor — incurred when products are received. These must be allocated properly to reflect true item cost in Zoho Inventory.

Step 1 — Enable Landed Cost Tracking

Navigate to Settings → Items and check the box to Track landed costs. Without this enabled, landed cost fields won’t appear on bills.

Step 2 — Create a Purchase Order

Select a vendor, add your items, and mark the PO as Issued. Landed costs aren’t applied here — they are applied on the bill level.

Step 3 — Convert PO to Bill & Add Landed Costs

Convert the PO to a bill. Use the Add Landed Cost button to include service items like freight or labor. These items must already exist in your inventory as service items.

Step 4 — Allocate Landed Costs

Choose an allocation method:

  • By Quantity: Spread based on item units
  • By Value: Weighted by item cost
  • By Dimensions/Weight: Based on item metrics if configured

You can mix allocation methods within a single bill depending on cost type.

Step 5 — Add Landed Costs from Another Bill

If charges come later (e.g., separate freight bill), create a new bill with just the landed cost item, then return to the original bill and select Add charges from another bill to apply them.

Step 6 — Verify Costs in Reports

Use the Inventory Valuation Summary to ensure landed costs are reflected in unit price. These updated costs influence FIFO/WAC calculations and Zoho Analytics if integrated.

FAQs

What is a landed cost?

Any extra charge like freight or duty added to the item’s acquisition cost.

How do I enable landed costs in Zoho Inventory?

Go to Settings → Items and enable “Track landed costs.”

Can I apply landed costs from separate bills?

Yes, use the “Add charges from another bill” option within the bill screen.

Do I need to use service items for landed costs?

Yes — they must be added as service items in inventory.

How are landed costs reflected in reporting?

They adjust item cost and flow into FIFO/weighted average analytics and valuation reports.

Need Help With Zoho Inventory?

Book a Free Consultation